Chemical Plant Disaster Scenario
Combinations of drought and flood scenario towards this
chemical plant.
Accident Event
1st Event
1. 17 Sept 2016 @ 9.45 am
2. Ferric acid tank (ferric chloride) collapsed releasing a large amount of ferric chloride.
3. This collapsed tank fell onto sodium hypochlorite transfer pipe system causing simultaneously mixing of these chemicals which produced a lethal and hazardous chlorine gas.
4. ERP triggered – Fast response from the Facilities ERT and BOMBA succeeded in neutralizing the chlorine gas; from 3 PPM @ 12 pm to 0.5 PPM @ 1 PM and to 0 PPM @ 3 PM.
5. However, one factory ERT team member and four firemen were given outpatient treatment.
6. Stinging odour smelled by the nearby residents causing itchy throats, severe cough and accompanied by burning sensation in their throats.
1. Flash flood caused by overflooded river nearby, results from heavy rain upstream.
2. The following day, 18 Sept 2016 @ 2 am, heavy rain pouring down onto the facilities and Bukit Merah area causing sudden flash flood, where the river nearby was overflowed.
3. The debris from the earlier event caused another disastrous event.
4. Strong overflow current washed away the debris and hit the nearby ferric acid tank and sodium hypochlorite tank causing sudden mix producing lethal and hazardous chlorine gas.
5. However, the mixing produced diluted hydrochloric acid which were hazardous and harmful to the facilities, personnel and environment.
Emergency Response Scenario
1st Event
Date : 17 Sept
2016
Time : 9.45 am
1.
9.50 am -
Long evacuation alarm sounded
2.
9.50 am -
Emergency Response Plan triggered and evacuation commences.
3.
9.55 am -
ERT mobilize and lead by Facility General Manager which is also the
Incident
Commander
- IC check on Emergency Management Team
-
HSE coordinates ERT movement, evacuation, scriber, brief IC
-
Liaison responsible for communications with public, BOMBA,
HAZMAT, POLICE and inter department
- Operation responsible for facility emergency
shutdown sequence.
- HR
responsible for headcount, family affairs
- Security
responsible for all security matters
4.
9.56 am -
Facility evacuated
5.
9.58 am -
ERT try to contain the release by setting up water curtain.
6. 9.58 am - IC calls Operation to execute emergency shutdown for the whole facility through designated stages.
7.
9.59 am -
IC contacts BOMBA, HAZMAT and POLICE for further assistance.
8.
10.00 am -
Setting up Incident Command Centre.
9.
10.05 am -
Release of Chlorine Gas escalates.
10.
10.06 am -BOMBA
and HAZMAT to the scene
11.
10.10 am -
Briefing to BOMBA, HAZMAT and Police on the current situation.
12.
10.15 am -
Police starts controlling access and egress
13.
10.15 am -
BOMBA and HAZMAT setting up perimeter water curtain, by using river
water and
neutralizing the chlorine gas concurrently.
14.
10.20 am -
Large reaction fumes produce whilst in neutralization.
15.
11.00 am -
Still in neutralization mode but it is satisfactorily contained
16.
12.00 pm -
chlorine gas reads at 3 PPM
17.
1.00 pm -
chlorine gas at 0.5 PPM
18.
3.00 pm -
chlorine gas at 0 PPM
19.
4.00 pm -
Debriefing over the operation
20.
4.30 pm -
Further investigation by ERT, BOMBA and HAZMAT.
2nd Event
Date : 18 Sept
2016
Time : 2.00 am
1. 2.00 am - Flash flood from overflow river nearby entering facilities premise.
2.
2.10 am -
Alarm not triggered as the power supply have been cut off due to earlier
event.
3.
2.15 am -
Remaining ERT, BOMBA, HAZMAT and Police are still in the facility. They
had to move to higher ground
which is at the operation building. Seeking
for help from BOMBA department
and Police.
4.
2.20 am -
Strong current washed away collapsed tank debris and yet hit another
nearby ferric acid tank and
sodium hypochlorite tank causing sudden mix
producing lethal and hazardous
chlorine gas again. However, the mixing
produced diluted hydrochloric
acid which were hazardous and harmful to
the facilities, personnel and
environment.
5.
2.30 am -
Facility bund wall designed was able to slow down the current and
eventually
enough to dilute chlorine gas and HCL.
6.
3.00 am -
The flash flood starts to diminish.
7.
3.15 am -
Flash flood stop and water with the remaining HCL is still in the premise as
the bund wall
design was to hold overflow river water. However, the
bund wall was
not quite high enough to stop the water from entering the
premise.
8.
3.30 am -
ERT, BOMBA, HAZMAT and Police setting up a new command centre at the
operation
building.
9.
3.45 am -
Mitigation plan commences. Checking the water for HCL concentration.
10.
3.50 am -
Pumping out the remaining water in the premise when the specifications of
hazardous chemical (HCL)
concentration are met.
11.
4.50 am -
Helps from another BOMBA fire brigade and Police arrive.
12.
5.00 am -
Operation debriefing
13.
5.30 am -
Continuing investigation of the 1st event.